SCHEMA
Schema
Panel
Academy
Sample
TrustLogin
CDN
Menu
Main Page
Vocabulary
land
Title:
Area:
Postal address:
longitude:
Latitude:
land exact area:
land aproximate area
please select
Less than 100
100 to 200
200 to 300
300 to 400
400 to 500
500 to 1000
1000 to 3000
3000 to 5000
5000 to 10000
more than 1 hectare
building area
please select
Less than 100
100 to 200
200 to 300
300 to 400
400 to 500
500 to 1000
1000 to 3000
3000 to 5000
5000 to 10000
more than 1 hectare
The number of main street sides of building:
building orientation
please select
North
South
East
West
location
please select
Main Street
Auxiliary road
Streetside
On the highway side
Deadlock
path with trees
Near the Park
alley
The number of phone lines:
bungalow title type
please select
without title
Personal
accommodation
endowment document
Paramount title
office design
Industrial
commercial
written promise
public
public
public
Joint
Goodwill
Ongoing
power of attorney
divided
current function:
recommended function:
Passage width :
Area of land :
main streets side of land length :
North Side length :
south side length :
east side length :
west side length :
number of wells:
land slope:
constructible area :
number of constructible floors:
facilities:
water
Agricultural water
electricity
Three phase power
Industrial Power
gas
Water piping
Gas piping
sewer
Walled
Guard
tarmacadam
Dirt road
drive
Separate Way
fruit trees
Forest trees
shed
correction
water Sprinkler system
conditions:
Loan
construction permit
water well drilling license
Description:
Thumbnail 1:
Thumbnail 2:
Thumbnail 3:
Title:
Description:
thumbnail original:
JSONLD
Copy